Burton St, Mosman

1/9

Please click on image to see full image

Scope of Works:
Demolition 2 residential houses with single access, Bulk Excavation of 1900m³ and Detailed Excavation of lift pit, crane base, footings and trenches.
 
Site Notes:
The site had two existing 2 storey dwellings, which were demolished. The site has been scrubbed of all vegetation and top soil to make way for a bulk excavation for a 5 level dwelling spanning over 130 meters of site. This site had a 10 metre lift shaft and stair case on the second level. This site had a 21 metre incline over 130 metres which meant we had some rather interesting angles to work at. 

 

Excavation method:

Bucket excavation of top soil, boundary rock sawing, hydraulic hammer excavation of lift shaft and rock grinding of hard to reach surfaces. 
 
Time on Site:
16 weeks including detailed excavations.

Sydney, NSW

© Proudly created with Wix.com