VAUCLUSE

Please click on image to see full image

Scope of Works:
Demolition, bulk excavation of 2552m³ and detailed excavation of lift pit, retention tank, footings and trenches.
 
Site Notes:
The site had an existing 2 storey dwelling, which was demolished. The site has been scrubbed of all vegetation and top soil to make way for a bulk excavation for an underground car park level with 3 levels above it. The site was made up to of 1/3 top soil and the rest sandstone which strengthens with depth. 

 

Excavation method:

Bucket excavation of top soil, boundary rock sawing and hydraulic hammer excavation once in sandstone. 
 
Time on Site:
12 weeks including detailed excavations.

Sydney, NSW