Lavender Bay II

Please click on image to see full image

Scope of Works:
Demolition, bulk excavation of 1005m³ and detailed excavation of lift pit, footings and trenches.
 
Site Notes:
The site had an existing 3 storey dwelling, which was demolished. The site has been excavated for construction of new building.

 

Excavation method:

Bucket excavation of top soil, boundary rock grinding and hydraulic hammer excavation. 
 
Time on Site:
12 weeks including detailed excavations and extra excavations.

Sydney, NSW