Livistona Ln, PALM BEACH

1/7

Please click on image to see full image

Scope of Works:
Bulk Excavation of 2300m³ and Detailed Excavation of lift pit, retention tank, footings and trenches.

 

Site Condition:
The site was a vegetated block of land that had a steep incline from ground level with a 600 tonne boulder at the peak of the site. The ground was a 50% mix of clay and sandstone. This project had 2 tiers with the first level being a 6 meter drop and the second being 9 meters to a the basement level.

 

Time on Site:
10 weeks including detailed excavations.