Wolseley Rd, Mosman

1/4

Please click on image to see full image

Scope of Works:
Partial demolition, bulk excavation of 500m³ and detailed excavation of retention tank, footings and trenches.
 
Site Notes:
Demolish existing 2 storey house leaving intact 2 walls on either side of site. Excavation of new wall footings along retained walls. Excavation of new service trenches. 

 

Excavation method:

Bucket excavation of top soil, rock sawing along inside of walls and hydraulic hammering bulk rock.  
 
Time on Site:
12 weeks including detailed excavations.

Sydney, NSW

© Proudly created with Wix.com